  • Kuno Project Ibaraki Prefecture
    Kuno Project (0.5 MW)
    COD 8/18/2015
  • Shima Project Toyama Prefecture (1.25 MW)
    COD 3/2/2016
  • Hikeme Project Fukui Prefecture (1.5 MW)
    COD 4/1/2016
  • Ryugasaki Project Ibaraki Prefecture (1.75 MW)
    COD 9/1/2016
  • Sakura Project Toyama Prefecture (1.99 MW)
    COD 11/2/2017
  • Jyoso Project Ibaraki Prefecture (1.25 MW)
    COD 5/2/2018
  • Hanamizuki Project Ishikawa Prefecture (13.5 MW)
    COD 1/2/2019
  • Onikoube Project Miyagi Prefecture (154.73 MW)
    SCOD 2022